On 04/18/2011 at 1AM MST we will be doing a major upgrade on our internal network infrastructure in Denver. This will increase our network capacity and will drastically increase our network perofmance and uptime.
The upgrade will include:
Upgrade cross-connect link between our Edge and Core router
Upgrade Core router supervisor engine
Upgrade Core router Switch uplink layer line card
Upgrade cross-connect link between our Core router and the end-server switches
Upgrade our Firewall Farm
We estimate that this will cause service interruptions for about 2 hours and to restore service at 3:AM MST. During this time all or partial traffic to our Denver facility systems will be disrupted.
We will be doing the similar network upgrade to our Chicago facility at a later date.